Alexander Orr, Jr. Reservoir Roof
 Information Partner  
The working Alexander Ore Reservoir GreenroofProject Name: Alexander Orr, Jr. Reservoir Roof
Year: 1998
Owner: Miami Dade Water and Sewer Department
Location: Miami, FL, USA
Building Type: Municipal/Government
Type: Intensive
System: Other
Size: 190000 sq.ft.
Slope: 1.25%
Access: Accessible, Private
Submitted by: Nick Leuci, C.I.M. Industries, Inc.

Designers/Manufacturers of Record:
Sales Manager: Nick Leuci, C.I.M. Industries, Inc.
Maintenance Superintendent: Bruce Lonic, Miami Dade Water and Sewer Dept
Waterproofing: CIM 1000
Applying the CIM 1000 waterproofingPhotos courtesy Nick LeuciThe growing media is several feet deep
"Miami-Dade's sole source for drinking water is ground water from wells. The wells feeding the Hialeah and John E. Preston water treatment plants which serve most Miami-Dade residents living between the Miami-Dade-Broward County line and SW 8th Street draw water only from the Biscayne Aquifer. This is also true of the wells feeding the South Dade Water Supply System, which is comprised of five smaller water treatment plants that serve residents south of SW 264th Street in the unincorporated areas of the County.

"The Alexander Orr, Jr. water treatment plant, which serves most County residents living between SW 8th Street and SW 264th Street, gets most of its water from the Biscayne Aquifer, supplemented by a smaller amount from the deeper Floridan Aquifer. Water from the two aquifers is blended at the plant prior to treatment," (Miami-Dade Water and Sewer Department, 2010).
The Alexander Orr, Jr. Reservoir building is a 30 million gallon potable water reservoir. A green roof was chosen for its aesthetic purposes. The building is located in a residential area and the owner wanted the finished reservoir to resemble an open field.

The roof was primed with an epoxy and waterproofed with CIM 1000, manufactured by C.I.M. Industries Inc. The CIM 1000 is a high solids, low odor elastomeric urethane modified with ashpalt. The CIM 1000 was applied 90 mils thick then covered with a protection board to protect the membrane from construction traffic. After the waterproofing was complete the roof was covered in several feet of soil and seeded with a grass seed local to the area.

Additional thumbnail photos:

See the Miami-Dade Water and Sewer Department Water Supply & Treatment page.
 
SPONSORS:
Website Sponsor Website Sponsor Website Sponsor Website Sponsor Website Sponsor Website Sponsor
Website Sponsor Website Sponsor Website Sponsor Website Sponsor Website Sponsor Website Sponsor
Website Sponsor Website Sponsor Website Sponsor Website Sponsor Website Sponsor Website Sponsor
 
The International Greenroof & Greenwall Projects Database is published, designed, and maintained by
Greenroofs.com, LLC, Copyright 2017. All rights reserved.